Location
Year of Completion
Type of Service
Client
-
- Northern Sumatra, Indonesia
- 2019
- PD, DD
- POSCO E&C
● Main Features
- Intake : B7.2m×H3.8m×1 Lane / Weir : Overflow type(Concrete Weir), H8.0m×L53.0m
- Desander : B8.0m×H3.95~11.59m×L80m×2Basin
- Headrace Tunnel : D4.0m×H4.25m×L2,668m / Headrace Channel : D4.0m×H4.0~4.7m×L1,362m
- Headpond : B18.0m×L43.2m×H8.95~16.2m / Penstock : D2.7m/1.5m×L1,266m
- Powerhouse : Ground L55.1m×H13.5m×B19.8m, Underground L43.9m×H9.65m×B15.8m
- Capacity : 14.15㎿×3 = 42.45㎿ / Annual Capacity : 242.24GWh